| Add_Holidays_On_Assignment_Adjust__c |
Add Holidays On Assignment Adjust |
Pre-Spring 2018 |
|
Checkbox |
false |
| Allow_Mass_Move_Assignments__c |
Allow Mass Move Assignments |
Pre-Spring 2018 |
|
Checkbox |
false |
| Assignment_AdditionalFields_Fieldset__c |
Assn Additional Fields Field Set Name |
Pre-Spring 2018 |
|
Text(90) |
|
| Assignment_Color_Field__c |
Assignment Color Field |
Summer 2018 |
Defines the API name of the field on an Assignment that controls the assignment color bars in Project Planner.
|
Text(90) |
|
| Assignment_Ordering__c |
Assignment Ordering |
Pre-Spring 2018 |
|
Text(255) |
"name" |
| Assignment_Search_Fieldset_Name__c |
Assignment Search Fieldset Name |
Pre-Spring 2018 |
|
Text(90) |
|
| Assignment_Tooltip_Field_Set__c |
Assignment Tooltip Field Set |
Pre-Spring 2018 |
|
Text(90) |
"Assignment_Tooltip_Field_Set" |
| Columns_Field_Set__c |
Columns Field Set |
Pre-Spring 2018 |
|
Text(90) |
"Project_Planner_Columns" |
| Default_Assignment_Future_Days__c |
Default Future Days to Show Assignments |
Pre-Spring 2018 |
|
Number(5,0) |
270 |
| Default_Assignment_Historical_Days__c |
Default Past Days to Show Assignments |
Pre-Spring 2018 |
|
Number(5,0) |
7 |
| Default_Resource_Image__c |
Default Resource Image |
Pre-Spring 2018 |
|
Url |
|
| Filter_Fieldset_Name__c |
Project Planner Filter Field Set |
Pre-Spring 2018 |
|
Text(90) |
|
| Hide_Cost_Rate__c |
Hide Cost Rate fields |
Fall 2018 |
Hides Cost Rate fields in the Create Assignment dialog for Project Planner
|
Checkbox |
true |
| Hide_Inline_Dialog__c |
DEPRECATED: Hide Inline Edit Dialog |
Pre-Spring 2018 |
|
Checkbox |
false |
| Inherit_Proj_Date_For_Create_Assignment__c |
Inherit Dates For Create Assignment |
Summer 2018 |
If selected, the start and end dates in the Create Assignments dialog are auto-populated from the project start and end dates.
|
Checkbox |
false |
| Inherit_Role_For_Create_Assignment__c |
Inherit Role For Create Assignment |
Summer 2018 |
If selected, the resource role in the Create Assignments dialog is auto-populated from the Contacts record.
|
Checkbox |
false |
| Inline_Edit_Mode_THHC__c |
DEPRECATED: Hold total hours constant |
Pre-Spring 2018 |
|
Checkbox |
true |
| Override_Assignment_Name_Field__c |
Override Assignment Name Field |
Pre-Spring 2018 |
|
Text(255) |
|
| Override_Resource_Request_Name_Field__c |
Override Resource Request Name Field |
Pre-Spring 2018 |
|
Text(255) |
|
| Project_Search_Fieldset_Name__c |
Project Search Fieldset Name |
Pre-Spring 2018 |
|
Text(90) |
|
| Project_Summary_Color_Field__c |
Project Summary Color Field |
Summer 2018 |
Defines the API name of the field on a Project that controls the Project Summary colors.
|
Text(90) |
|
| Project_Tooltip_Field_Set__c |
Project Tooltip Field Set |
Pre-Spring 2018 |
|
Text(90) |
"Project_Tooltip_Field_Set" |
| Record_Load_Limit__c |
Record Load Limit |
Pre-Spring 2018 |
|
Number(5,0) |
5 |
| Res_Request_Tooltip_Field_Set__c |
Resource Request Tooltip Field Set |
Pre-Spring 2018 |
|
Text(90) |
"Res_Request_Tooltip_Field_Set" |
| ResourceRequest_Search_Fieldset_Name__c |
Resource Request Search Fieldset Name |
Pre-Spring 2018 |
|
Text(90) |
|
| Resource_Request_Color_Field__c |
Resource Request Color Field |
Summer 2018 |
Defines the API name of the field on a Resource Request that controls the Resource Request color bars in Project Planner.
|
Text(90) |
|
| Resource_Request_Ordering__c |
Resource Request Ordering |
Pre-Spring 2018 |
|
Text(255) |
"name" |
| Restrict_Creation_Past_Dates__c |
Restrict Creation Past Dates |
Pre-Spring 2018 |
If selected, you cannot create an assignment with start date in the past. The default value is deselected.
|
Checkbox |
false |
| Restrict_Editing_Past_Dates__c |
Restrict Editing Past Dates |
Pre-Spring 2018 |
If selected, you cannot edit Project Planner assignment and schedule hours in the past. The default value is deselected.
|
Checkbox |
false |
| Restrict_Swapping_Past_Dates__c |
Restrict Swapping Past Dates |
Pre-Spring 2018 |
If selected, you cannot swap the resource on an assignment with a start date set in the past. The default value is deselected.
|
Checkbox |
false |
| Save_Column_Prefs__c |
Save Column Preferences |
Pre-Spring 2018 |
|
Checkbox |
true |
| Scheduling_Mode__c |
Respect Schedules |
Spring 2021 |
When True, schedules and schedule exceptions are respected when assignments or resource requests are dragged and dropped in the Project Planner timeline. Non-working time is respected. The default value is False.
|
Text(255) |
"False" |
| Use_Beige__c |
Use Beige |
Summer 2018 |
Checkbox to use Beige for cells in Project Planner. Default = False.
|
Checkbox |
false |
| Use_Light_Blue__c |
Use Light Blue |
Summer 2018 |
Checkbox to use Light Blue for cells in Project Planner. Default = False.
|
Checkbox |
false |
| Use_Light_Green__c |
Use Light Green |
Summer 2018 |
Checkbox to use Light Green for cells in Project Planner. Default = False.
|
Checkbox |
false |
| Use_Light_Red__c |
Use Light Red |
Summer 2018 |
Checkbox to use Light Red for cells in Project Planner. Default = False.
|
Checkbox |
false |
| Use_Light_Yellow__c |
Use Light Yellow |
Summer 2018 |
Checkbox to use Light Yellow for cells in Project Planner. Default = False.
|
Checkbox |
false |
| Use_Pink__c |
Use Pink |
Summer 2018 |
Checkbox to use Pink for cells in Project Planner. Default = False.
|
Checkbox |
false |
| Use_Purple__c |
Use Purple |
Summer 2018 |
Checkbox to use Purple for cells in Project Planner. Default = False.
|
Checkbox |
false |
| Use_Turquoise__c |
Use Turquoise |
Summer 2018 |
Checkbox to use Turquoise for cells in Project Planner. Default = False.
|
Checkbox |
false |
| require_staffing_permission__c |
Edit Requires Staffing Permission |
Pre-Spring 2018 |
|
Checkbox |
false |