| pse__Adjust_Hours_Strategy_Respects_Holidays__c |
Adjust Hours Strategy Respects Holidays |
Pre-Spring 2018 |
If it is true, then Schedules created by "Adjust Hours Per Day" will respect holidays and create exceptions for them and adjust hours by spreading hours across other days.
|
Checkbox |
|
false |
| pse__Allow_Resource_Currency_on_Assignment__c |
Allow Resource Currency Code on Assn |
Pre-Spring 2018 |
If selected, the Cost Rate Currency Code on an assignment can be manually updated to the resource currency code.
|
Checkbox |
|
false |
| pse__AssigRes_IsResource_Active_Lookup_FIlter__c |
AssigRes IsResource Active Lookup FIlter |
Pre-Spring 2018 |
|
Checkbox |
|
false |
| pse__AssigRes_Is_Resource_Lookup_Filter__c |
AssigRes Is Resource Lookup Filter |
Pre-Spring 2018 |
|
Checkbox |
|
false |
| pse__Assign_Multi_Res_Assignment_Fieldset__c |
Assign Multiple Resources Field Set |
Summer 2026 |
Defines additional custom columns in the Assignment Details grid of the Assign Multiple Resources to Project window.
|
Text(255) |
false |
|
| pse__Assign_Multi_Resources_Columns_Field_Set__c |
Assign Multiple Resources Columns |
Spring 2023 |
Defines the columns that display in the Assign Multiple Resources to Project window.
|
Text(50) |
false |
|
| pse__Assign_Multi_Resources_to_Project_Limit__c |
Assign Resources to Project Limit |
Spring 2026 |
The maximum number of resources that can be assigned at once using the Project Action: Assign Multiple Resources to Project action. If no value is set, the default value is 250.
|
Number(5,0) |
false |
250 |
| pse__Assign_Resource_Custom_Lookup_Columns__c |
Assign Resource Custom Lookup Columns |
Pre-Spring 2018 |
|
Text(255) |
false |
"Name,Account.Name,Is_Resource__c,Is_Resource_Active__c,Resource_Role__c" |
| pse__Assign_Resource_Custom_Lookup__c |
Assign Resource Custom Lookup |
Pre-Spring 2018 |
|
Checkbox |
|
false |
| pse__Assign_Resource_Milestone_Lookup_Columns__c |
Assign Resource Milestone Lookup Columns |
Pre-Spring 2018 |
Field to hold the comma separated list field api names that will displayed as column in milestone lookup popup.
|
Text(255) |
false |
"Name" |
| pse__Assign_Resource_Milestone_Lookup__c |
Assign Resource Milestone Lookup |
Pre-Spring 2018 |
Field to control display of custom milestone lookup on UI
|
Checkbox |
|
false |
| pse__Assign_Resource_Milestone_Required__c |
Assign Resource Milestone Required |
Pre-Spring 2018 |
Field to mark custom milestone as required or not. If true, it is will be required and else not.
|
Checkbox |
|
false |
| pse__Assignment_Name_Project_Name_Max_Length__c |
Assignment Name Project Name Max Length |
Pre-Spring 2018 |
Configuration of Max-Length of Project Name in auto generated Assignment Name.
|
Number(2,0) |
false |
38 |
| pse__Assignment_Name_Resource_Name_Max_Length__c |
Assignment Name Resource Name Max Length |
Pre-Spring 2018 |
Configuration of Max-Length of Resource Name in auto generated Assignment Name.
|
Number(2,0) |
false |
38 |
| pse__Assignment_Revenue_Sync_Job_Size__c |
Update Dated Revenue: Job Size |
Winter 2026 |
The number of records processed per job by the asynchronous process that updates planned and projected revenue on assignments that use dated resource bill rates. The default is 200.
|
Number(4,0) |
false |
200 |
| pse__Auto_Assign_Allow_Non_Exact_Matching__c |
DEPRECATED: AA: Allow Non-Exact Matching |
Summer 2022 |
This field is obsolete.
|
Checkbox |
|
false |
| pse__Auto_Share_with_New_Resource__c |
Auto Share with New Resource |
Pre-Spring 2018 |
Defines whether to share an assignment and schedule with the resource's Salesforce user on creation or when the resource is changed. You can set the value to Read or Edit to define the level of sharing. If no value is set, no action is taken.
|
Text(5) |
false |
|
| pse__Close_Assignment_Limit__c |
Close Assignment Limit |
Spring 2026 |
The maximum number of assignments that can be closed using the Close Assignment action on a Project and Contact. If no value is set, the default is 1800.
|
Number(5,0) |
false |
1800 |
| pse__Cost_Rate_Hidden__c |
Hide Cost Rate Column |
Summer 2026 |
If selected, the Cost Rate column does not display in the Assign Multiple Resources to Project window.
|
Checkbox |
|
false |
| pse__Create_Assignments_from_PT_Limit__c |
Create Assignments from PT Limit |
Spring 2026 |
The maximum number of assignments that can be created at once using the Project Action: Create Assignments from Project Tasks action. If no value is set, the default value is 250.
|
Number(5,0) |
false |
250 |
| pse__Day_Of_Week_Hidden__c |
Hide Day of Week Columns |
Summer 2026 |
If selected, the day-of-week columns (Sunday through Saturday) do not display in the Assign Multiple Resources to Project window.
|
Checkbox |
|
false |
| pse__Default_Scheduling_Strategy_Unheld_RRs__c |
Default Scheduling Strategy Unheld RRs |
Summer 2024 |
Indicates the scheduling strategy for unheld resource requests created directly on a project, opportunity, or a work planner. Valid values are: Adjust Hours Per Day Calculate End Date, Ignore Availability Custom Percent Allocation Whole Hours Distribution Zero Hour Schedule
|
Text(40) |
false |
|
| pse__Default_Scheduling_Strategy__c |
Default Scheduling Strategy |
Fall 2021 |
Indicates the default scheduling strategy used in holding and assigning resources. Valid values are: Adjust Hours Per Day Calculate End Date, Level Schedule Calculate End Date, Ignore Availability Custom Percent Allocation Whole Hours Distribution Zero Hour Schedule
|
Text(60) |
false |
|
| pse__Delete_Share_from_Old_Resource__c |
Delete Share from Old Resource |
Pre-Spring 2018 |
Defines whether the existing share of the assignment and schedule with the resource's Salesforce user is deleted when the resource on the assignment is changed.
|
Checkbox |
|
false |
| pse__Disable_Bill_Rate_Null_Check_in_Trigger__c |
Disable Bill Rate Null Check in Trigger |
Pre-Spring 2018 |
When selected, PSA does not check that bill rates have been applied.
|
Checkbox |
|
true |
| pse__Disable_RPG_Role_Defaulting__c |
Disable RPG and Role Filter Defaults |
Fall 2019 |
Disables the default values for the Region, Practice, Group, and Role filters on the Assign Resource page.
|
Checkbox |
|
false |
| pse__Display_Planned_Bill_Rate__c |
Display Planned Bill Rate |
Pre-Spring 2018 |
|
Checkbox |
|
false |
| pse__Edit_Schedule_Default_Strategy__c |
Edit Schedule Default Strategy |
Pre-Spring 2018 |
The default scheduling strategy for the Edit Assignment Schedule page. Possible values are "level", "ignore", "day" and ''PercentAllocation" for "Calculate End Date, Level Schedule", "Calculate End Date, Ignore Availability", "Adjust Hours Per Day" and "Percent Allocation" respectively
|
Text(255) |
false |
"ignore" |
| pse__Hide_Adjust_Hours_Scheduling_Strategy__c |
Hide Adjust Hours Scheduling Strategy |
Pre-Spring 2018 |
Indicates whether the Adjust Hours Per Day scheduling strategy is hidden on the Assign Resource to Project, Edit Assignment Schedule and Staffer Worksheet pages.
|
Checkbox |
|
false |
| pse__Hide_Custom_Scheduling_Strategy__c |
Hide Custom Scheduling Strategy |
Pre-Spring 2018 |
Indicates whether the Custom Scheduling Strategy is hidden on the Assign Resource to Project and Staffer Worksheet pages.
|
Checkbox |
|
false |
| pse__Hide_Ignore_Avail_Scheduling_Strategy__c |
Hide Ignore Avail Scheduling Strategy |
Pre-Spring 2018 |
Indicates whether the Calculate End Date Ignore Availability scheduling strategy is hidden on the Assign Resource to Project, Edit Assignment Schedule and Staffer Worksheet pages.
|
Checkbox |
|
false |
| pse__Hide_Level_Schedule_Scheduling_Strategy__c |
Hide Level Schedule Scheduling Strategy |
Pre-Spring 2018 |
Indicates whether the Calculate End Date Level Schedule scheduling strategy is hidden on the Assign Resource to Project, Edit Assignment Schedule and Staffer Worksheet pages.
|
Checkbox |
|
false |
| pse__Hide_Percent_Alloc_Scheduling_Strategy__c |
Hide Percent Alloc Scheduling Strategy |
Pre-Spring 2018 |
Indicates whether the Percent Allocation scheduling strategy is hidden on the Assign Resource to Project, Edit Assignment Schedule and Staffer Worksheet pages.
|
Checkbox |
|
false |
| pse__Hide_Scheduling_Strategy_Section__c |
Hide Schedule Selection Section |
Summer 2025 |
Indicates whether the Schedule Selection section is hidden in the Create Resource Request window in work planners and the Project and Opportunity pages.
|
Checkbox |
|
false |
| pse__Hide_Whole_Hours_Scheduling_Strategy__c |
Hide Whole Hours Scheduling Strategy |
Summer 2026 |
Indicates whether the Whole Hours Distribution scheduling strategy is hidden on the Assign Resource to Project, Edit Assignment Schedule, and Staffer Worksheet pages.
|
Checkbox |
|
false |
| pse__Hide_Zero_Hour_Scheduling_Strategy__c |
Hide Zero Hour Scheduling Strategy |
Pre-Spring 2018 |
Indicates whether the Zero Hour Schedule scheduling strategy is hidden on the Assign Resource to Project and Staffer Worksheet pages.
|
Checkbox |
|
false |
| pse__Link_Assignment_Header_Tooltip_Fields__c |
Link Assignment Header Tooltip Fields |
Pre-Spring 2018 |
Comma delimited list of API names of fields to be listed when hovering over the tooltip icon on the Link Assignment to Milestones page.
|
TextArea |
false |
"Assignment_Number__c,Project__r.Name,Resource__r.Name,Is_Billable__c,Start_Date__c,End_Date__c,Scheduled_Hours__c" |
| pse__Link_Assignments_to_Milestone_Limit__c |
Link Assignments to Milestone Limit |
Spring 2026 |
The maximum number of assignments that can be linked to milestones using the mass action Milestone: Link Assignments action. If no value is set, the default is 6000.
|
Number(5,0) |
false |
6000 |
| pse__Link_Methodology_Header_Tooltip_Fields__c |
Link Methodology Header Tooltip Fields |
Pre-Spring 2018 |
Comma delimited list of API names of fields to be listed when hovering over the tooltip icon on the Link Methodology to Assignments page.
|
TextArea |
false |
"Name,project__r.name" |
| pse__Link_Milestone_Header_Tooltip_Fields__c |
Link Milestone Header Tooltip Fields |
Pre-Spring 2018 |
Comma delimited list of API names of fields to be listed when hovering over the tooltip icon on the Link Milestone to Assignments page.
|
TextArea |
false |
"Name,Target_Date__c,Milestone_Amount__c" |
| pse__Link_Phase_Header_Tooltip_Fields__c |
Link Phase Header Tooltip Fields |
Pre-Spring 2018 |
Comma delimited list of API names of fields to be listed when hovering over the tooltip icon on the Link Phase to Assignments page.
|
TextArea |
false |
"Name,project__r.name" |
| pse__Mass_Assign_Budget_Allocation_Editable__c |
Mass Assign Budget Allocation Editable |
Summer 2024 |
When true the Budget Allocation field is shown in the assignment detail section of the Assign Multiple Resources to Project window.
|
Checkbox |
|
false |
| pse__Mass_Assign_Budget_Allocation_Required__c |
Mass Assign Budget Allocation Required |
Summer 2024 |
When true the Budget Allocation field must be completed for each assignment to be created on the Assign Multiple Resources to Project window.
|
Checkbox |
|
false |
| pse__Mass_Assign_Milestone_Editable__c |
Mass Assign Milestone Editable |
Pre-Spring 2018 |
When true the Milestone field is shown in the quick update section and assignment detail section of the Mass Assign Resources to Project page. The field is also shown on the Mass Assign Projects to Resource page.
|
Checkbox |
|
false |
| pse__Mass_Assign_Milestone_Required__c |
Mass Assign Milestone Required |
Pre-Spring 2018 |
When true the Milestone field must be completed for each assignment to be created on the Mass Assign Projects to Resource page and the Mass Assign Resources to Project page.
|
Checkbox |
|
false |
| pse__Mass_Assign_Projects_Load_Limit__c |
Mass Assign Projects Load Limit |
Pre-Spring 2018 |
Controls how many projects are returned in the results when searching on the Mass Assign Projects To Resource page. Values higher than 2000 are not recommended due to risk of exceeding platform view state. Default value is 1000.
|
Number(5,0) |
false |
1000 |
| pse__Mass_Assignments_Default_Ignore_Holidays__c |
Mass Assignments Default Ignore Holidays |
Pre-Spring 2018 |
Determines whether the Mass Assignment Ignore Holidays checkbox is checked by default.
|
Checkbox |
|
true |
| pse__Multi_Assign_Assignment_Fieldset_Name__c |
Multi Assign Assignment Fieldset Name |
Pre-Spring 2018 |
Allows users to create a custom fieldset on the Assignment object and write the fieldset's API name to this custom setting. Fields added to this fieldset are displayed as read-only fields on the Multi Assigned Assignment to Milestone UI.
|
Text(255) |
true |
"LinkMilestoneAssignmentColumns" |
| pse__Multi_Assign_Milestone_Fieldset_Name__c |
Multi Assign Milestone Fieldset Name |
Pre-Spring 2018 |
Allows users to create a custom fieldset on the Milestone object and write the fieldset's API name to this custom setting. Fields added to this fieldset are displayed as read-only fields on the Multi Assigned Assignment to Milestone UI.
|
Text(255) |
true |
"LinkAssignmentMilestoneColumns" |
| pse__Percent_Allocation_Hidden__c |
Hide Percent Allocation Column |
Summer 2026 |
If selected, the Percent Allocation column does not display in the Assign Multiple Resources to Project window.
|
Checkbox |
|
false |
| pse__Planned_Hours_Hidden__c |
Hide Planned Hours Column |
Summer 2026 |
If selected, the Planned Hours column does not display in the Assign Multiple Resources to Project window.
|
Checkbox |
|
false |
| pse__Retain_Schedule_On_Assign__c |
Retain Schedule On Assign |
Spring 2021 |
If selected, and the Display Schedule Options Window for the Resourcing component is enabled, users can select whether to retain the preferred schedule on the resource request when assigning a resource. If selected, and the Lightning App Builder property is disabled, the preferred schedule is retained automatically when assigning a resource.
|
Checkbox |
|
false |
| pse__Retain_Schedule_On_Hold__c |
Retain Schedule On Hold |
Summer 2023 |
If selected, and the Display Schedule Options Window for the Resourcing component is enabled, users can select whether to retain the preferred schedule on the resource request when holding a resource. If selected, and the Lightning App Builder property is disabled, the preferred schedule is retained automatically when holding a resource.
|
Checkbox |
|
false |
| pse__Retain_Schedule_On_Unassign__c |
Retain Schedule On Unassign |
Summer 2024 |
If selected, the preferred schedule on the resource request is retained when unassigning a resource.
|
Checkbox |
|
false |
| pse__Retain_Schedule_On_Unhold__c |
Retain Schedule On Unhold |
Summer 2024 |
If selected, the preferred schedule on the resource request is retained when unholding a resource.
|
Checkbox |
|
false |
| pse__Retain_schedule_exceptions_on_update__c |
Retain schedule exceptions on update |
Pre-Spring 2018 |
If deselected, when a schedule's date range is changed, schedule exceptions that are partly or wholly outside the schedule's date range are deleted. Note: This potentially alters part of the schedule that is still within range. If selected, when a schedule's date range is changed, schedule exceptions that are wholly outside the schedule's date range are deleted. Schedule exceptions that are partly outside the schedule's date range are shortened to fit within the new schedule date range.
|
Checkbox |
|
false |
| pse__Role_Hidden__c |
Role Hidden |
Pre-Spring 2018 |
If selected, the Role field is hidden when assigning a resource using the Assign Resource to Project page or action on a project. This requires the Role Required on Creation setting to be deselected.
|
Checkbox |
|
false |
| pse__Role_Required_On_Creation__c |
Role Required On Creation |
Pre-Spring 2018 |
If selected, the Role field is required when assigning a resource using the Assign Resource to Project page or action on a project.
|
Checkbox |
|
false |
| pse__Scheduled_Hours_Hidden__c |
Hide Scheduled Hours Column |
Summer 2026 |
If selected, the Scheduled Hours column does not display in the Assign Multiple Resources to Project window.
|
Checkbox |
|
false |
| pse__Sync_Assignments_To_DRR_Job_Size__c |
Update Revenue from DRR: Job Size |
Winter 2026 |
The number of records processed per job by the asynchronous process that updates revenue on assignments to reflect updates to dated resource rates. The default is 400.
|
Number(8,0) |
false |
400 |
| pse__Sync_Assignments_To_DRR_Max_Jobs__c |
Update from DRR Changes: Max Jobs |
Winter 2026 |
The maximum number of jobs that are run at once by the asynchronous process that updates cost and revenue values on assignments to reflect updates to dated resource rates. This value, along with the value in either the Update Revenue from DRR: Job Size or Update Costs from DRR: Job Size setting, determines the number of assignments queried simultaneously. By default, this setting is blank, but you can configure it if the asynchronous process is blocking other processes from running at the same time.
|
Number(8,0) |
false |
|
| pse__Timecard_Statuses__c |
Timecard Statuses |
Pre-Spring 2018 |
|
Text(255) |
false |
"Submitted,Approved" |
| pse__Unlink_Assignments_to_Milestone_Limit__c |
Unlink Assignments to Milestone Limit |
Spring 2026 |
The maximum number of assignments that can be unlinked from milestones using the mass action Milestone: Unlink Assignments action. If no value is set, the default is 4000.
|
Number(5,0) |
false |
4000 |
| pse__Update_Assignment_Cost_Amount_Job_Size__c |
Update Dated Costs: Job Size |
Spring 2026 |
The number of records processed per job by the asynchronous process that updates the Projected Cost Amount on assignments that use dated resource rates. The default is 200.
|
Number(4,0) |
false |
200 |
| pse__Update_Assignment_Cost_Amount_Sync_Limit__c |
Update Dated Costs: Sync Limit |
Spring 2026 |
The number of assignments that use dated resource rates, whose Projected Cost Amount is recalculated immediately on save. When the sync limit is reached, additional records are recalculated in an asynchronous process. The default is 200.
|
Number(4,0) |
false |
200 |
| pse__Update_Costs_From_DRR_Job_Size__c |
Update Costs from DRR: Job Size |
Summer 2026 |
The number of records processed per job by the asynchronous process that updates the Projected Cost Amount on assignments to reflect updates to dated resource rates. The default is 400.
|
Number(4,0) |
false |
400 |
| pse__Update_Dated_Revenue_Sync_Limit__c |
Update Dated Revenue: Sync Limit |
Summer 2026 |
The number of assignments that use dated resource rates, whose projected and planned revenue is recalculated immediately on save. When the sync limit is reached, additional records are recalculated in an asynchronous process. The default is 200.
|
Number(4,0) |
false |
200 |
| pse__Update_Future_Scheduled_Hours__c |
Update Future Scheduled Hours |
Winter 2026 |
If selected, updated future scheduled hours will be updated when an assignment schedule is edited.
|
Checkbox |
|
false |
| pse__Use_Default_Cost_Rate_Clear_on_Assigning__c |
Use Default Cost Rate Clear on Assigning |
Pre-Spring 2018 |
Indicates whether the default value of the Use Default Cost Rate checkbox is unchecked on the Assign Resource to Project, Mass Assign Resources to Project and Mass Assign Projects To Resource pages.
|
Checkbox |
|
false |
| pse__Use_Default_Cost_Rate_Hidden__c |
Hide Use Default Cost Rate Column |
Summer 2026 |
If selected, the Use Default Cost Rate column does not display in the Assign Multiple Resources to Project window.
|
Checkbox |
|
false |
| pse__Use_Scheduled_Days__c |
Use Scheduled Days for Calculations |
Fall 2018 |
Use the value recorded in the Scheduled Days field on assignments for calculations on the Project Cost and Revenue Summary.
|
Checkbox |
|
false |