Professional Services Automation Object Model Diagrams
Home
Objects
Assignment and Milestone
Backlog
Billing Batch
Billing Event Items
Billing Events
Budget Allocation
Budgets
Calendar Events
Enhanced Forecasting Setup
Enhanced Services Forecasting
Expenses
Experiences
Groups
Permission Controls
Planner Filters
Practices
Project Tasks
Project Versions
Projects
Regions
Resource (Contact)
Resource Actuals
Resource Requests
Revenue Recognition Forecast Versioning
Risks and Issues
Schedule and Rate Card
Services Credits
Services Forecasting
SF Objects
Shortlists
Skills
Teams
Time and Calendar
Time Variance
Timecard and Assignment Settings
Timecard API
Timecards
Timer
Transactions
Utilization
Utilization Analytics
Vendor Invoices
G
Cost_Forecast__c
Cost Forecast
+Cost Forecast Name
+Name
Name
-Corp: Costs Pending Recognition
-Corp_Costs_Pending_Recognition__c
Corp_Costs_Pending_Recognition__c
-Corp: Costs Recognized to Date
-Corp_Costs_Recognized_To_Date__c
Corp_Costs_Recognized_To_Date__c
-Corp: Currency
-Corp_Currency__c
Corp_Currency__c
#Corp: Margin
#Corp_Margin__c
Corp_Margin__c
-Corp: Scheduled Costs
-Corp_Scheduled_Costs__c
Corp_Scheduled_Costs__c
#Corp: Total Approved Costs
#Corp_Total_Approved_Costs__c
Corp_Total_Approved_Costs__c
-Corp: Unscheduled Costs
-Corp_Unscheduled_Costs__c
Corp_Unscheduled_Costs__c
-Costs Pending Recognition
-Costs_Pending_Recognition__c
Costs_Pending_Recognition__c
-Costs Recognized to Date
-Costs_Recognized_To_Date__c
Costs_Recognized_To_Date__c
-Last Updated
-Last_Updated__c
Last_Updated__c
#Margin
#Margin__c
Margin__c
#Margin (%)
#Margin_Percent__c
Margin_Percent__c
-Milestone
-Milestone__c
Milestone__c
-Opportunity
-Opportunity__c
Opportunity__c
-Opportunity Probability (%)
-Opportunity_Probability__c
Opportunity_Probability__c
-Project
-Project__c
Project__c
-Revenue Forecast
-Revenue_Forecast__c
Revenue_Forecast__c
-Scheduled Costs
-Scheduled_Costs__c
Scheduled_Costs__c
-Time Period
-Time_Period__c
Time_Period__c
#Time Period End
#Time_Period_End__c
Time_Period_End__c
#Time Period Start
#Time_Period_Start__c
Time_Period_Start__c
#Total Approved Costs
#Total_Approved_Costs__c
Total_Approved_Costs__c
-Unscheduled Costs
-Unscheduled_Costs__c
Unscheduled_Costs__c
Revenue_Forecast__c
Revenue Forecast
+Revenue Forecast Name
+Name
Name
-Actual Hours
-Actual_Hours__c
Actual_Hours__c
-Actual Weighted Effort
-Actual_Weighted_Effort__c
Actual_Weighted_Effort__c
#Actuals
#Actuals__c
Actuals__c
#Corp: Actuals
#Corp_Actuals__c
Corp_Actuals__c
-Corp: Currency
-Corp_Currency__c
Corp_Currency__c
-Corp: Revenue Pending Recognition
-Corp_Revenue_Pending_Recognition__c
Corp_Revenue_Pending_Recognition__c
-Corp: Revenue Recognized to Date
-Corp_Revenue_Recognized_To_Date__c
Corp_Revenue_Recognized_To_Date__c
-Corp: Scheduled Revenue
-Corp_Scheduled_Revenue__c
Corp_Scheduled_Revenue__c
-Corp: Unscheduled Revenue
-Corp_Unscheduled_Revenue__c
Corp_Unscheduled_Revenue__c
-Last Updated
-Last_Updated__c
Last_Updated__c
-Milestone
-Milestone__c
Milestone__c
-Opportunity
-Opportunity__c
Opportunity__c
-Opportunity Probability (%)
-Opportunity_Probability__c
Opportunity_Probability__c
-Project
-Project__c
Project__c
-Revenue Pending Recognition
-Revenue_Pending_Recognition__c
Revenue_Pending_Recognition__c
-Revenue Recognized to Date
-Revenue_Recognized_To_Date__c
Revenue_Recognized_To_Date__c
-Scheduled Hours
-Scheduled_Hours__c
Scheduled_Hours__c
-Scheduled Revenue
-Scheduled_Revenue__c
Scheduled_Revenue__c
-Scheduled Weighted Effort
-Scheduled_Weighted_Effort__c
Scheduled_Weighted_Effort__c
-Time Period
-Time_Period__c
Time_Period__c
#Time Period End
#Time_Period_End__c
Time_Period_End__c
#Time Period Start
#Time_Period_Start__c
Time_Period_Start__c
-Unscheduled Hours
-Unscheduled_Hours__c
Unscheduled_Hours__c
-Unscheduled Revenue
-Unscheduled_Revenue__c
Unscheduled_Revenue__c
+ Run_Revenue_Forecast_Opportunity()
+ Run_Revenue_Forecast()
Cost_Forecast__c->Revenue_Forecast__c
Milestone__c
Milestone
Cost_Forecast__c->Milestone__c
Opportunity
Opportunity
Cost_Forecast__c->Opportunity
Proj__c
Project
Cost_Forecast__c->Proj__c
Time_Period__c
Time Period
Cost_Forecast__c->Time_Period__c
Cost_Forecast_Staging__c
Cost Forecast Staging
+Cost Forecast Staging Name
+Name
Name
-Cost Category
-Cost_Category__c
Cost_Category__c
-Cost Source
-Cost_Source__c
Cost_Source__c
-Cost Type
-Cost_Type__c
Cost_Type__c
-Costs Pending Recognition
-Costs_Pending_Recognition__c
Costs_Pending_Recognition__c
-Costs Recognized to Date
-Costs_Recognized_To_Date__c
Costs_Recognized_To_Date__c
-Milestone
-Milestone__c
Milestone__c
-Opportunity
-Opportunity__c
Opportunity__c
-Project
-Project__c
Project__c
-Scheduled Costs
-Scheduled_Costs__c
Scheduled_Costs__c
-Time Period
-Time_Period__c
Time_Period__c
-Unscheduled Costs
-Unscheduled_Costs__c
Unscheduled_Costs__c
Cost_Forecast_Staging__c->Milestone__c
Cost_Forecast_Staging__c->Opportunity
Cost_Forecast_Staging__c->Proj__c
Cost_Forecast_Staging__c->Time_Period__c
Cost_Forecast_Type__c
Cost Forecast Type
+Cost Forecast Type Name
+Name
Name
-Corp: Costs Pending Recognition
-Corp_Costs_Pending_Recognition__c
Corp_Costs_Pending_Recognition__c
-Corp: Costs Recognized to Date
-Corp_Costs_Recognized_To_Date__c
Corp_Costs_Recognized_To_Date__c
-Corp: Currency
-Corp_Currency__c
Corp_Currency__c
-Corp: Scheduled Costs
-Corp_Scheduled_Costs__c
Corp_Scheduled_Costs__c
-Corp: Unscheduled Costs
-Corp_Unscheduled_Costs__c
Corp_Unscheduled_Costs__c
-Cost Category
-Cost_Category__c
Cost_Category__c
-Cost Forecast
-Cost_Forecast__c
Cost_Forecast__c
-Cost Source
-Cost_Source__c
Cost_Source__c
-Cost Type
-Cost_Type__c
Cost_Type__c
-Costs Pending Recognition
-Costs_Pending_Recognition__c
Costs_Pending_Recognition__c
-Costs Recognized to Date
-Costs_Recognized_To_Date__c
Costs_Recognized_To_Date__c
-Last Updated
-Last_Updated__c
Last_Updated__c
-Milestone
-Milestone__c
Milestone__c
-Opportunity
-Opportunity__c
Opportunity__c
-Project
-Project__c
Project__c
-Scheduled Costs
-Scheduled_Costs__c
Scheduled_Costs__c
-Unscheduled Costs
-Unscheduled_Costs__c
Unscheduled_Costs__c
Cost_Forecast_Type__c->Cost_Forecast__c
Cost_Forecast_Type__c->Milestone__c
Cost_Forecast_Type__c->Opportunity
Cost_Forecast_Type__c->Proj__c
Revenue_Forecast__c->Milestone__c
Revenue_Forecast__c->Opportunity
Revenue_Forecast__c->Proj__c
Revenue_Forecast__c->Time_Period__c
Revenue_Forecast_Batch__c
Revenue Forecast Batch
+Revenue Forecast Name
+Name
Name
-Batch ID
-Batch_Id__c
Batch_Id__c
-Batch Process
-Batch_Process__c
Batch_Process__c
-Status
-Status__c
Status__c
Revenue_Forecast_Batch_Lock__c
Revenue Forecast Batch Lock
+Revenue Forecast Batch Lock Name
+Name
Name
-Record ID
-Record_Id__c
Record_Id__c
Revenue_Forecast_Batch_Log__c
Revenue Forecast Batch Log
+Revenue Forecast Batch Log Name
+Name
Name
-Message
-Message__c
Message__c
-Opportunity
-Opportunity__c
Opportunity__c
-Project
-Project__c
Project__c
-Revenue Forecast Batch
-Revenue_Forecast_Batch__c
Revenue_Forecast_Batch__c
Revenue_Forecast_Batch_Log__c->Revenue_Forecast_Batch__c
Revenue_Forecast_Batch_Log__c->Opportunity
Revenue_Forecast_Batch_Log__c->Proj__c
Revenue_Forecast_Batch_Status__c
Revenue Forecast Batch Status
+Revenue Forecast Batch Status Name
+Name
Name
-Opportunity
-Opportunity__c
Opportunity__c
-Record ID
-Record_Id__c
Record_Id__c
-Revenue Forecast Batch Update Pending
-Revenue_Forecast_Batch_Update_Pending__c
Revenue_Forecast_Batch_Update_Pending__c
-Revenue Forecast Last Updated
-Revenue_Forecast_Last_Updated__c
Revenue_Forecast_Last_Updated__c
-Revenue Forecast Processing Status
-Revenue_Forecast_Processing_Status__c
Revenue_Forecast_Processing_Status__c
Revenue_Forecast_Batch_Status__c->Opportunity
Revenue_Forecast_Setup__c
Revenue Forecast Setup
+Revenue Forecast Setup Name
+Name
Name
-Active
-Active__c
Active__c
-Actuals Cutoff Day
-Actuals_Cutoff_Day__c
Actuals_Cutoff_Day__c
-Assignment % Complete Weighting Field
-Assignment_Percent_Comp_Weighting_Field__c
Assignment_Percent_Comp_Weighting_Field__c
-Assignment Bill Rate Field
-Assignment_Bill_Rate_Field__c
Assignment_Bill_Rate_Field__c
-Custom Date for Deliverable Expenses
-Custom_Date_For_Deliverable_Expenses__c
Custom_Date_For_Deliverable_Expenses__c
-Custom Date for Deliverable Milestones
-Custom_Date_For_Deliverable_Milestones__c
Custom_Date_For_Deliverable_Milestones__c
-Custom Date for Deliverable Misc Adjusts
-Custom_Date_For_Deliverable_Misc_Adjusts__c
Custom_Date_For_Deliverable_Misc_Adjusts__c
-Custom Filter Field Set
-Custom_Filter_Field_Set__c
Custom_Filter_Field_Set__c
-Enable Cost Forecasting
-Enable_Cost_Forecasting__c
Enable_Cost_Forecasting__c
-Exclude Actuals After Cutoff Day
-Exclude_Actuals_After_Cutoff_Day__c
Exclude_Actuals_After_Cutoff_Day__c
-Exclude from Forecast Assignment Field
-Exclude_From_Forecast_Assignment_Field__c
Exclude_From_Forecast_Assignment_Field__c
-Exclude from Forecast RR Field
-Exclude_From_Forecast_Resource_Req_Field__c
Exclude_From_Forecast_Resource_Req_Field__c
-Exclude Opportunities
-Exclude_Opportunities__c
Exclude_Opportunities__c
-Exclude Opportunities for Versions
-Exclude_Opportunities_For_Versions__c
Exclude_Opportunities_For_Versions__c
-Exclude Probability from Opportunities
-Exclude_Opportunity_Probabilities__c
Exclude_Opportunity_Probabilities__c
-Exclude Resource Requests on Project
-Exclude_Resource_Requests_On_Project__c
Exclude_Resource_Requests_On_Project__c
-Exclude Revenue Recognition Actuals
-Exclude_Revenue_Recognition_Actuals__c
Exclude_Revenue_Recognition_Actuals__c
-Exclude Scheduled Hrs in Closed Periods
-Exclude_Scheduled_Hrs_in_Closed_Periods__c
Exclude_Scheduled_Hrs_in_Closed_Periods__c
-Exclude Unscheduled Revenue for Versions
-Exclude_Unscheduled_Revenue_For_Versions__c
Exclude_Unscheduled_Revenue_For_Versions__c
-Expected Project End Date Field on Opp
-Project_End_Date_on_Opportunity__c
Project_End_Date_on_Opportunity__c
-Expected Project Start Date Field on Opp
-Project_Start_Date_on_Opportunity__c
Project_Start_Date_on_Opportunity__c
-Forecast Factor Batch Size
-Forecast_Factor_Batch_Size__c
Forecast_Factor_Batch_Size__c
-Hover Details Field Set on Milestone
-Hover_Details_Field_Set_On_Milestone__c
Hover_Details_Field_Set_On_Milestone__c
-Hover Details Field Set on Opportunity
-Hover_Details_Field_Set_On_Opportunity__c
Hover_Details_Field_Set_On_Opportunity__c
-Hover Details Field Set on Project
-Hover_Details_Field_Set_On_Project__c
Hover_Details_Field_Set_On_Project__c
-Include Best Case
-Include_Best_Case__c
Include_Best_Case__c
-Include RRs on Opportunities
-Include_RRs_on_Opportunities__c
Include_RRs_on_Opportunities__c
-Include Unheld RRs with Schedules
-Include_Unheld_RRs_with_Schedules__c
Include_Unheld_RRs_with_Schedules__c
-Include Unheld RRs without Schedules
-Include_Unheld_RRs_without_Schedules__c
Include_Unheld_RRs_without_Schedules__c
-Include Worst Case
-Include_Worst_Case__c
Include_Worst_Case__c
-Maximum Concurrent Jobs
-Maximum_Concurrent_Jobs__c
Maximum_Concurrent_Jobs__c
-Object for Version Grouping
-Version_Grouping_Primary__c
Version_Grouping_Primary__c
-Opportunity Batch Size
-Opportunity_Batch_Size__c
Opportunity_Batch_Size__c
-Opportunity Best Case Threshold (%)
-Opportunity_Best_Case_Threshold__c
Opportunity_Best_Case_Threshold__c
-Opportunity Expected Threshold (%)
-Opportunity_Expected_Case_Threshold__c
Opportunity_Expected_Case_Threshold__c
-Opportunity Scheduler Batch Size
-Opportunity_Scheduler_Batch_Size__c
Opportunity_Scheduler_Batch_Size__c
-Opportunity Worst Case Threshold (%)
-Opportunity_Worst_Case_Threshold__c
Opportunity_Worst_Case_Threshold__c
-Persist Adjustments Across Versions
-Persist_Adjustments_Across_Versions__c
Persist_Adjustments_Across_Versions__c
-Project Batch Size
-Project_Batch_Size__c
Project_Batch_Size__c
-Project Scheduler Batch Size
-Project_Scheduler_Batch_Size__c
Project_Scheduler_Batch_Size__c
-Resource Request Bill Rate Field
-Resource_Request_Bill_Rate_Field__c
Resource_Request_Bill_Rate_Field__c
-Respect Permission Controls
-Respect_Permission_Controls__c
Respect_Permission_Controls__c
-Retain Pending Costs in Closed Periods
-Retain_Pending_Costs_In_Closed_Periods__c
Retain_Pending_Costs_In_Closed_Periods__c
-Retain Pending Revenue in Closed Periods
-Retain_Pending_Revenue_In_Closed_Periods__c
Retain_Pending_Revenue_In_Closed_Periods__c
-RR % Complete Weighting Field
-Res_Req_Percent_Comp_Weighting_Field__c
Res_Req_Percent_Comp_Weighting_Field__c
-Total Hours Field on Project
-Total_Hours_Field_on_Project__c
Total_Hours_Field_on_Project__c
-Total Revenue Field on Milestone
-Milestone_Total_Revenue_Field__c
Milestone_Total_Revenue_Field__c
-Total Revenue Field on Project
-Project_Total_Revenue_Field__c
Project_Total_Revenue_Field__c
-Use Mid Month Forecast Calculations
-Use_Mid_Month_Forecast_Calculations__c
Use_Mid_Month_Forecast_Calculations__c
-Use Sched and Actual Hrs for % Complete
-Use_Sched_And_Actual_Hrs_In_Percent_Comp__c
Use_Sched_And_Actual_Hrs_In_Percent_Comp__c
-Use Weighting for % Complete
-Use_Weighted_Percent_Comp_Calc__c
Use_Weighted_Percent_Comp_Calc__c
-Version Detail Batch Size
-Version_Detail_Batch_Size__c
Version_Detail_Batch_Size__c
-Version Forecast Period
-Version_Forecast_Period__c
Version_Forecast_Period__c
-Version Forecast Period Override
-Version_Forecast_Period_Override__c
Version_Forecast_Period_Override__c
Revenue_Forecast_Staging__c
Revenue Forecast Staging
+Revenue Forecast Staging Name
+Name
Name
-Actual Hours
-Actual_Hours__c
Actual_Hours__c
-Actual Weighted Effort
-Actual_Weighted_Effort__c
Actual_Weighted_Effort__c
-Milestone
-Milestone__c
Milestone__c
-Project
-Project__c
Project__c
-Revenue Pending Recognition
-Revenue_Pending_Recognition__c
Revenue_Pending_Recognition__c
-Revenue Recognized to Date
-Revenue_Recognized_To_Date__c
Revenue_Recognized_To_Date__c
-Revenue Source
-Revenue_Source__c
Revenue_Source__c
-Revenue Type
-Revenue_Type__c
Revenue_Type__c
-Scheduled Hours
-Scheduled_Hours__c
Scheduled_Hours__c
-Scheduled Revenue
-Scheduled_Revenue__c
Scheduled_Revenue__c
-Scheduled Weighted Effort
-Scheduled_Weighted_Effort__c
Scheduled_Weighted_Effort__c
-Time Period
-Time_Period__c
Time_Period__c
-Unscheduled Hours
-Unscheduled_Hours__c
Unscheduled_Hours__c
-Unscheduled Revenue
-Unscheduled_Revenue__c
Unscheduled_Revenue__c
Revenue_Forecast_Staging__c->Milestone__c
Revenue_Forecast_Staging__c->Proj__c
Revenue_Forecast_Staging__c->Time_Period__c
Revenue_Forecast_Type__c
Revenue Forecast Type
+Revenue Forecast Type Name
+Name
Name
#Actuals
#Actuals__c
Actuals__c
#Corp: Actuals
#Corp_Actuals__c
Corp_Actuals__c
-Corp: Currency
-Corp_Currency__c
Corp_Currency__c
-Corp: Revenue Pending Recognition
-Corp_Revenue_Pending_Recognition__c
Corp_Revenue_Pending_Recognition__c
-Corp: Revenue Recognized to Date
-Corp_Revenue_Recognized_To_Date__c
Corp_Revenue_Recognized_To_Date__c
-Corp: Scheduled Revenue
-Corp_Scheduled_Revenue__c
Corp_Scheduled_Revenue__c
-Corp: Unscheduled Revenue
-Corp_Unscheduled_Revenue__c
Corp_Unscheduled_Revenue__c
-Milestone
-Milestone__c
Milestone__c
-Opportunity
-Opportunity__c
Opportunity__c
-Project
-Project__c
Project__c
-Revenue Forecast
-Revenue_Forecast__c
Revenue_Forecast__c
-Revenue Pending Recognition
-Revenue_Pending_Recognition__c
Revenue_Pending_Recognition__c
-Revenue Recognized to Date
-Revenue_Recognized_To_Date__c
Revenue_Recognized_To_Date__c
-Revenue Source
-Revenue_Source__c
Revenue_Source__c
-Revenue Type
-Revenue_Type__c
Revenue_Type__c
-Scheduled Revenue
-Scheduled_Revenue__c
Scheduled_Revenue__c
-Unscheduled Revenue
-Unscheduled_Revenue__c
Unscheduled_Revenue__c
Revenue_Forecast_Type__c->Revenue_Forecast__c
Revenue_Forecast_Type__c->Milestone__c
Revenue_Forecast_Type__c->Opportunity
Revenue_Forecast_Type__c->Proj__c
Milestone__c->Proj__c
Opportunity->Proj__c
Proj__c->Time_Period__c
© Copyright 2009–2025 Certinia Inc. All rights reserved. Various trademarks held by their respective owners.