Forecast Curve Fields

Here is a description of the fields on the Forecast Curve page.

Key:
* – Mandatory field.R – Read-only.

Field   Description
Lag *

The lag, in days, to apply before starting forecast calculations.

  • For Opportunity forecast curves, the lag is based on the opportunity Close Date.
  • For Unscheduled Backlog forecast curves on a project, the lag is based on the day the calculation is run.

The default value is 0.

Max Forecast Period R Roll-up summary of the length of the forecast periods.
Total Curve Period R Roll-up summary of the maximum forecast periods and lag.